Oruditsa 2000, Ltd. has started the implementation of project No. BGTR0300150 (EE4FUTURE) "Joint responsibility and sustainable development for the future in the cross-border region", funded by the INTERREG VI-A IPA Bulgaria - Türkiye 2021-2027 Programme, after Mr. Zdravko Stanev signed a financing agreement on 01.08.2025. Our partner in the project is Ersan Machinery Industrial Facilities Manufacturing Trade and Assembly Industry Ltd., located in the city of Kırklareli, Türkiye.

The total budget of the project is 781 306,31 BGN (399 481,70 Euro), and the budget of Oruditsa 2000, Ltd. (Lead Partner) is 390 350,96 BGN (199 586,34 Euro), distributed as follows:

  • Grant (Interreg funds) - 85% with a maximum amount of 331 798,30 BGN (169 648,38 Euro);
  • National co-financing - 15% of the value – 58 552,66 BGN (29 937,96 Euro).

The project is financed under program priority 1: "Environmentally friendly cross-border region" and its main objective is the joint implementation of urgent energy efficiency measures in production enterprises in the cross-border region through the implementation of technological equipment and the introduction of a system for monitoring, control and management of energy consumption. The main activities of the project will achieve a reduction in the energy resources consumed, a subsequent reduction in the greenhouse gases generated and the limitation of adverse effects on the environment and climate.

The main activities of the project are:

  • Activity 1.1 Organizing the work of a joint project management team
  • Activity 1.2 Publicity and dissemination
  • Activity 2.1 Selection of contractors for carrying out repair work in the production base of Ersan Machinery, supply of equipment and System for monitoring, control and management of electric energy consumption
  • Activity 2.2 Performing repair works on a production building
  • Activity 2.3 Delivery of technological equipment
  • Activity 2.4 Joint implementation of automated Systems for monitoring, control and management of energy consumption
  • Activity 3.1 Knowledge and best practices at management and expert level in the field of renewable energy and application and in industry
Project BGTR0300150

The project implementation period is 24 months from 02.08.2025 until 01.08.2027.

In this regard, on 11 September 2025, the project manager Eng. Anastasiya Koleva was a guest at an official ceremony at the Ministry of Regional Development and Public Works, where the start of the implementation of all projects financed under the INTERREG VI-A IPA Bulgaria - Türkiye 2021-2027 Program was announced.